Topsham-Brunswick Bridge

The Brunswick-Topsham Bridge Design Advisory Committee (DAC) was an ad hoc Committee, appointed by the Topsham Select Board and Brunswick Town Council, with the charge “to ensure that the final design of the [Maine Department of Transportation’s proposed] new bridge best meets both the State’s responsibility to meet the public’s transportation needs, and incorporates, to the degree that is financially feasible, the aesthetic and functional needs and preferences of Topsham and Brunswick, and to work with the Maine Department of Transportation to optimize the final design for the new bridge”.

The most recent recommendations from the DAC for the bridge's design are available to view here.

The DAC’s meeting agendas, minutes, and deliberative materials are available for review.

The images on this page are some of the MDOT renderings of the proposed bridge. 

Construction on the bridge has started on July 23 and it is expected to be completed in Fall of 2025. Project completion of pocket parks, which are small parks on each side of the river, are projected to be completed in Spring of 2026.